Boston Project: Construction3

October 18th, 2010 · No Comments · 2010 What Stands Between...




Here is all walls in the folding room assembled (with production assistant Blake Sherwood standing inside to give us an idea of how much space the performers will have).


We’re starting the perimeter cage that the folding room folds back into (and will connect with the rest of the lake).

(btw, these photos are light tests as well: the space only looks like this when the sunlight is in the right place and the atmospheric generators are on)


Category: 2010 What Stands Between...

No Comments so far ↓

There are no comments yet...Kick things off by filling out the form below.

Leave a Comment