Boston Project: Construction3

October 18th, 2010 · No Comments · 2010 What Stands Between...

SBUS-blog-7

 

SBUS-blog-8

Here is all walls in the folding room assembled (with production assistant Blake Sherwood standing inside to give us an idea of how much space the performers will have).

SBUS-blog-9

We’re starting the perimeter cage that the folding room folds back into (and will connect with the rest of the lake).

(btw, these photos are light tests as well: the space only looks like this when the sunlight is in the right place and the atmospheric generators are on)

 

Category: 2010 What Stands Between...

No Comments so far ↓

There are no comments yet...Kick things off by filling out the form below.

Leave a Comment