Fabricating Installation

December 14th, 2015 · No Comments · 2015 This Land is a Ship at Sea

1

This was our first version for holding the video projectors–we failed to realize these projector trays would place each projector in the way of the opposite projector. Time to do it again.

2

Second draft: Each projector gets it’s own adjustable stand. This allows maximum flexibility when we install on the island (and don’t have access to electricity).

3

Framing finished. We’ll attach the rear-projection fabric on site.

4

Our installation is loaded on the white pickup truck. This barge takes all of the exhibition artists’ work to the island, which was somewhat a delightful surprise to us: some bridges you just have to cross when you get there.

Category: 2015 This Land is a Ship at Sea

No Comments so far ↓

There are no comments yet...Kick things off by filling out the form below.

Leave a Comment